CSAH 58 over PHALEN BL. BUSH; UP RR

0.2 MI N OF JCT PAYNE AV · County 123, Minnesota · Built 1998 · 2 Lanes · 4,029 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
62567
Year Built
1998
Length
125.9 m (413.1 ft)
Max Span
20.7 m
Width
17.8 m (58.4 ft)
Lanes
2
Daily Traffic
4,029
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.