MSAS 288 over UP; BNSF RR

.25 MI E OF JCT PENN; 35 · County 123, Minnesota · Built 2004 · 4 Lanes · 14,400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
62598
Year Built
2004
Length
233.8 m (767.1 ft)
Max Span
44.6 m
Width
25.6 m (84 ft)
Lanes
4
Daily Traffic
14,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.