MSAS 128 over UP RR; E 7TH ST
AT THE JCT 7TH ST; EARL · County 123, Minnesota · Built 2003 · 2 Lanes · 3,326 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
44.966972, -93.055817
This bridge is in worse condition than 5.8% of bridges in County 123. The average bridge in Minnesota is 0 years old; this one is 23 years old.
Nearby Bridges
MSAS 135 over PHALEN BLVD; UP RR
Built 1942
US 61 over PHALEN BLVD; UP RR
Built 2001
MSAS 301 over VENTO TRAIL
Built 2004
MSAS 288 over VENTO TRAIL
Built 2004
MSAS 108 over RCRRA; STROHS
Built 1978
MSAS 179 over UP RR
Built 1985
M 823 over PEDESTRIAN UNDERTAKE
Built 1905
CSAH 58 over PHALEN BL. BUSH; UP RR
Built 1998
MSAS 128 over I 94
Built 1973
LRT over JOHNSON PKWY
Built 2024
Bridge Details
- Structure #
- 62545
- Year Built
- 2003
- Length
- 199.3 m (653.9 ft)
- Max Span
- 28 m
- Width
- 16.7 m (54.8 ft)
- Lanes
- 2
- Daily Traffic
- 3,326
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- N/A