T 252 over TRIB PIPESTONE CREEK

1.0 MI W OF JCT CSAH 13 · County 117, Minnesota · Built 2020 · 2 Lanes · 27 vehicles/day

Overall
Good
Culvert
9
Excellent

Bridge Details

Structure #
59K20
Year Built
2020
Length
8.5 m (27.9 ft)
Max Span
3.9 m
Lanes
2
Daily Traffic
27
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.