T 252 over TRIB PIPESTONE CREEK

0.6 MI W OF JCT CSAH 13 · County 117, Minnesota · Built 2011 · 2 Lanes · 22 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
59J55
Year Built
2011
Length
8.5 m (27.9 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
22
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$120,000,000
Total Project Cost
$145,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.