CSAH 1 over OTTER TAIL RIVER
1.2 MI S OF JCT CSAH 18 · County 111, Minnesota · Built 1981 · 2 Lanes · 3,350 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
46.311131, -96.008689
This bridge is in worse condition than 64.2% of bridges in County 111. The average bridge in Minnesota is 0 years old; this one is 45 years old.
Nearby Bridges
T 1022 over DITCH
Built 2004
T 1023 over OTTER TAIL RIVER
Built 2006
CSAH 1 over HOOT L-WRIGHT L CHANNEL
Built 1975
T 1024 over OTTER TAIL RIVER
Built 1977
T 1572 over OTTER TAIL RIVER
Built 2006
M 171 over OTTER TAIL RIVER
Built 1974
MSAS 121 over OTTER TAIL RIVER
Built 2009
MSAS 109 over OTTER TAIL RIVER
Built 2005
MSAS 145 over OTTER TAIL RIVER
Built 1955
MSAS 116 over OTTER TAIL RIVER
Built 1908
Bridge Details
- Structure #
- 56523
- Year Built
- 1981
- Length
- 30.9 m (101.4 ft)
- Max Span
- 10.2 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,350
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $563,000,000
- Total Project Cost
- $311,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.