MSAS 145 over OTTER TAIL RIVER

0.3 MI N OF JCT VERNON · County 111, Minnesota · Built 1955 · 2 Lanes · 5,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
7001
Year Built
1955
Length
46.6 m (152.9 ft)
Max Span
19.4 m
Width
19.2 m (63 ft)
Lanes
2
Daily Traffic
5,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$870,808,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.