CSAH 60 over OTTER TAIL RIVER
0.8 MI NE OF JCT TH 10 · County 111, Minnesota · Built 1968 · 2 Lanes · 570 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
46.663242, -95.639203
This bridge is in worse condition than 83.1% of bridges in County 111. The average bridge in Minnesota is 0 years old; this one is 58 years old.
Nearby Bridges
T 291 over OTTER TAIL RIVER
Built 1992
US 10 over OTTER TAIL RIVER
Built 1972
T 308 over Otter Tail River
Built 2002
T 269 over Otter Tail River
Built 2002
CSAH 60 over STREAM
Built 1953
CON 5852 over US 10
Built 1973
CSAH 51 over OTTER TAIL RIVER
Built 1959
CSAH 34 over US 10
Built 1973
T 230 over TOAD RIVER
Built 1978
M 28 over RIVER DR/OTTER TAIL RIVE
Built 1982
Bridge Details
- Structure #
- 56513
- Year Built
- 1968
- Length
- 28.4 m (93.2 ft)
- Max Span
- 9.5 m
- Width
- 11.4 m (37.4 ft)
- Lanes
- 2
- Daily Traffic
- 570
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $346,000,000
- Total Project Cost
- $202,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.