CSAH 51 over OTTER TAIL RIVER

2.3 MI N OF JCT TH 10 · County 111, Minnesota · Built 1959 · 2 Lanes · 2,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 6 Satisfactory
Substructure 6 Satisfactory

Location

46.627314, -95.575069

This bridge is in worse condition than 64.2% of bridges in County 111. The average bridge in Minnesota is 0 years old; this one is 67 years old.

Nearby Bridges

Bridge Details

Structure #
56503
Year Built
1959
Length
23 m (75.5 ft)
Max Span
7.7 m
Width
9.5 m (31.2 ft)
Lanes
2
Daily Traffic
2,300
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$272,000,000
Total Project Cost
$291,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.