MN 100 over BNSF CEDAR LK; 23RD

1.3 MI N OF JCT TH 7 · County 053, Minnesota · Built 1936 · 6 Lanes · 116,215 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
5310
Year Built
1936
Reconstructed
1989
Length
74.1 m (243.1 ft)
Max Span
18.3 m
Width
37.6 m (123.4 ft)
Lanes
6
Daily Traffic
116,215
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.