MSAS 130 over RED RIVER; 3RD ST
AT NO DAKOTA STATE LINE · County 027, Minnesota · Built 1937 · 4 Lanes · 4,635 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
46.875164, -96.776558
This bridge is in worse condition than 79.9% of bridges in County 027. The average bridge in Minnesota is 0 years old; this one is 89 years old.
Nearby Bridges
NP AVE. over RED RIVER OF THE NORTH
Built 1937
US HIGHWAY 10 over RED RIVER OF THE NORTH
Built 2004
US 10 over RED R OF THE N; 3RD ST
Built 2003
1ST AVE NORTH over RED RIVER OF THE NORTH
Built 1983
MSAS 115 over RED RIVER OF THE NORTH
Built 1981
ACCESS RD AND BNSF over 2ND ST NORTH OF MAIN
Built 1970
US 10/MAIN AVENUE over US 81/10TH STREET
Built 1938
12TH AVENUE NORTH over RED RIVER OF THE NORTH
Built 1988
MSAS 129 over RED RIVER OF THE NORTH
Built 1988
MSAS 129 over CO DITCH #4
Built 1995
Bridge Details
- Structure #
- 5270
- Year Built
- 1937
- Reconstructed
- 1986
- Length
- 260.8 m (855.6 ft)
- Max Span
- 30.5 m
- Width
- 17 m (55.8 ft)
- Lanes
- 4
- Daily Traffic
- 4,635
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $999,999,000
- Total Project Cost
- $291,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.