MSAS 129 over RED RIVER OF THE NORTH

0.5 MI W OF JCT CSAH 3 · County 027, Minnesota · Built 1988 · 2 Lanes · 8,133 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
14523
Year Built
1988
Length
152.4 m (500 ft)
Max Span
30.5 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
8,133
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$999,999,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.