US 61 over Cannon River

2.0 MI E OF JCT TH 50 · County 037, Minnesota · Built 1930 · 2 Lanes · 5,113 vehicles/day

Overall
Fair
Culvert
5
Fair

Condition Ratings

ComponentRatingDescription
Culvert 5 Fair

Location

44.600619, -92.812561

This bridge is in worse condition than 68.9% of bridges in County 037. The average bridge in Minnesota is 0 years old; this one is 96 years old.

Nearby Bridges

Bridge Details

Structure #
4933
Year Built
1930
Length
10.4 m (34.1 ft)
Max Span
3 m
Lanes
2
Daily Traffic
5,113
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$261,000,000
Total Project Cost
$85,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.