US 61 over STREAM

6.5 MI S OF HASTINGS · County 037, Minnesota · Built 1929 · 2 Lanes · 2,406 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
4860
Year Built
1929
Length
10.4 m (34.1 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,406
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$261,000,000
Total Project Cost
$85,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.