US 52 over STREAM

2.6 MI N OF N JCT TH 60 · County 049, Minnesota · Built 1928 · 4 Lanes · 21,347 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
4762
Year Built
1928
Length
8 m (26.2 ft)
Max Span
3.8 m
Lanes
4
Daily Traffic
21,347
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$139,000,000
Total Project Cost
$40,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.