US 52 over STREAM

0.3 MI N OF N JCT TH 60 · County 049, Minnesota · Built 1959 · 4 Lanes · 21,347 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
91047
Year Built
1959
Length
7.1 m (23.3 ft)
Max Span
3.4 m
Lanes
4
Daily Traffic
21,347
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.