CSAH 2 over CHIPPEWA RIVER
0.3 MI E OF JCT CSAH 5 · County 051, Minnesota · Built 1957 · 2 Lanes · 290 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
3
Serious
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 3 | Serious |
| Substructure | 5 | Fair |
Location
45.90495, -95.793417
This bridge is in worse condition than 90.6% of bridges in County 051. The average bridge in Minnesota is 0 years old; this one is 69 years old.
Nearby Bridges
T 5 over CHIPPEWA RIVER
Built 1969
T 164 over CHIPPEWA RIVER
Built 1966
CR 38 over CP RAIL
Built 1910
CSAH 25 over CHIPPEWA RIVER
Built 1987
MN 55 over POMME DE TERRE RIVER
Built 2020
CSAH 2 over POMME DE TERRE RIVER
Built 2006
T 166 over POMME DE TERRE RIVER
Built 1992
T 148 over Pomme De Terre River
Built 2000
MN 27 over CHIPPEWA RIVER
Built 1989
CSAH 1 over CHIPPEWA RIVER
Built 2013
Bridge Details
- Structure #
- 458
- Year Built
- 1957
- Length
- 9.5 m (31.2 ft)
- Max Span
- 8.8 m
- Width
- 8.6 m (28.2 ft)
- Lanes
- 2
- Daily Traffic
- 290
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $90,000,000
- Total Project Cost
- $100,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.