T 148 over Pomme De Terre River

0.1 MI E OFJCT TH 59 · County 051, Minnesota · Built 2000 · 2 Lanes · 25 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
26J02
Year Built
2000
Length
14 m (45.9 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
25
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.