CR 80 over CHETAMBA CREEK (JD #7)
0.3 MI W OF JCT CR 116 · County 067, Minnesota · Built 1963 · 2 Lanes · 45 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 3 | Serious |
Location
44.963989, -95.154425
This bridge is in worse condition than 90.3% of bridges in County 067. The average bridge in Minnesota is 0 years old; this one is 63 years old.
Nearby Bridges
CR 80 over CHETAMBA CREEK (JD #8)
Built 1963
T 16 over CHETAMBA CREEK (JD #7)
Built 1964
CR 116 over CO DITCH # 31
Built 1941
CR 80 over JUD DITCH # 7
Built 1963
T 60 over CO DITCH # 31
Built 1979
T 28 over CO DITCH # 8
Built 1978
CSAH 1 over CHETAMBA CREEK (JD #7)
Built 1940
T 2 over CO DITCH # 31
Built 1978
T 139 over CO DITCH # 8
Built 1978
T 818 over CHETAMBA CREEK (JD #7)
Built 1978
Bridge Details
- Structure #
- 34504
- Year Built
- 1963
- Length
- 19.4 m (63.6 ft)
- Max Span
- 8 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 45
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $183,000,000
- Total Project Cost
- $132,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.