CR 80 over JUD DITCH # 7
0.4 MI E OF JCT CSAH 1 · County 067, Minnesota · Built 1963 · 2 Lanes · 45 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
1
Imminent Failure
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 1 | Imminent Failure |
Location
44.963925, -95.177969
This bridge is in worse condition than 96.8% of bridges in County 067. The average bridge in Minnesota is 0 years old; this one is 63 years old.
Nearby Bridges
CSAH 1 over CHETAMBA CREEK (JD #7)
Built 1940
T 16 over CHETAMBA CREEK (JD #7)
Built 1964
CR 80 over CHETAMBA CREEK (JD #7)
Built 1963
T 818 over CHETAMBA CREEK (JD #7)
Built 1978
CR 116 over CO DITCH # 31
Built 1941
CR 80 over CHETAMBA CREEK (JD #8)
Built 1963
T 139 over CHETAMBA CREEK (JD #7)
Built 1978
T 818 over CHETAMBA CREEK (JD #7)
Built 1978
MN 7 over CHETAMBA CREEK (JD #7)
Built 1977
T 60 over CO DITCH # 31
Built 1979
Bridge Details
- Structure #
- 34502
- Year Built
- 1963
- Length
- 13.5 m (44.3 ft)
- Max Span
- 6.5 m
- Width
- 8.4 m (27.6 ft)
- Lanes
- 2
- Daily Traffic
- 45
- Material
- Wood or Timber
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $149,000,000
- Total Project Cost
- $142,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.