M 2027 over BNSF RR

0.1 MI S OF GLENWOOD AVE · County 053, Minnesota · Built 1979 · 2 Lanes · 3,594 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
27729
Year Built
1979
Length
214.8 m (704.7 ft)
Max Span
32.9 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
3,594
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
$445,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.