CON 5320 over GLENWOOD AVE; RR

0.3 MI N OF JCT TH 394 · County 053, Minnesota · Built 1978 · 1 Lanes · 5,187 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
27727A
Year Built
1978
Length
344.1 m (1128.9 ft)
Max Span
41.3 m
Width
8 m (26.2 ft)
Lanes
1
Daily Traffic
5,187
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$999,999,000
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.