MN 30 over STREAM

2.5 MI W OF JCT TH 43; 30 · County 045, Minnesota · Built 2005 · 2 Lanes · 1,150 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
23X06
Year Built
2005
Length
7.9 m (25.9 ft)
Max Span
3 m
Lanes
2
Daily Traffic
1,150
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$75,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.