MN 16 over STREAM

2.9 MI W OF S JCT TH 43 · County 045, Minnesota · Built 1929 · 2 Lanes · 1,397 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
1763
Year Built
1929
Length
6.9 m (22.6 ft)
Max Span
3 m
Lanes
2
Daily Traffic
1,397
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$80,000,000
Total Project Cost
$36,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.