T 66 over VERMILLION RIVER

0.3 MI E OF JCT CSAH 85 · County 037, Minnesota · Built 2005 · 2 Lanes · 97 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
19551
Year Built
2005
Length
40.4 m (132.5 ft)
Max Span
15.2 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
97
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$507,000,000
Total Project Cost
$1,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.