CR 62 over VERMILLION RIVER

0.1 MI W OF JCT CSAH 66 · County 037, Minnesota · Built 2003 · 2 Lanes · 2,004 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
19540
Year Built
2003
Length
46.5 m (152.6 ft)
Max Span
18.3 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
2,004
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.