I-75 NB over BLAKELY DRAIN

0.2 MI S OF TAYLOR · County 163, Michigan · Built 1964 · 3 Lanes · 46,853 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000011626
Year Built
1964
Reconstructed
2019
Length
12.2 m (40 ft)
Max Span
11.4 m
Width
19.3 m (63.3 ft)
Lanes
3
Daily Traffic
46,853
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.