I-75 SB over BLAKELY DRAIN

0.2 MI S OF TAYLOR · County 163, Michigan · Built 1964 · 4 Lanes · 46,853 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000011625
Year Built
1964
Reconstructed
2018
Length
12.6 m (41.3 ft)
Max Span
11.9 m
Width
24.6 m (80.7 ft)
Lanes
4
Daily Traffic
46,853
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.