M-3 (GRATIOT) over I-94
IN DETROIT · County 163, Michigan · Built 2018 · 8 Lanes · 36,180 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.391358, -83.006392
This bridge is in worse condition than 10.3% of bridges in County 163. The average bridge in Michigan is 0 years old; this one is 8 years old.
Nearby Bridges
MCCLELLAN AVE over I-94
Built 1957
CADILLAC AVE over I-94
Built 2022
BURNS AVE over I-94
Built 2022
FRENCH ROAD over I-94
Built 2019
M-53(VANDYKE ST) over I-94
Built 2013
SB CONNER AVE over I-94
Built 1958
NB CONNER AVE over I-94
Built 1958
FRONTENAC AVE over I-94
Built 2022
BARRETT AVE over I-94
Built 1958
CONCORD AVE over I-94
Built 2019
Bridge Details
- Structure #
- 000000000011245
- Year Built
- 2018
- Length
- 72 m (236.2 ft)
- Max Span
- 35.4 m
- Width
- 39.3 m (128.9 ft)
- Lanes
- 8
- Daily Traffic
- 36,180
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.