FRONTENAC AVE over I-94
IN DETROIT · County 163, Michigan · Built 2022 · 2 Lanes · 1,615 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.384906, -83.02635
This bridge is in worse condition than 10.3% of bridges in County 163. The average bridge in Michigan is 0 years old; this one is 4 years old.
Nearby Bridges
CONCORD AVE over I-94
Built 2019
M-53(VANDYKE ST) over I-94
Built 2013
HARPER AVE over I-94
Built 1958
MT ELLIOT ST over I-94
Built 2021
SAGINAW ST U-TRN over I-94
Built 1983
BURNS AVE over I-94
Built 2022
LUCKY PLACE over I-94
Built 1983
WB E GRAND BLVD over I-94
Built 2021
CHENE RAMP TO I-94 over E BD E GRAND BLVD
Built 1983
EB E GRAND BLVD over I-94
Built 2021
Bridge Details
- Structure #
- 000000000011219
- Year Built
- 2022
- Length
- 61.3 m (201.1 ft)
- Max Span
- 31.4 m
- Width
- 18.5 m (60.7 ft)
- Lanes
- 2
- Daily Traffic
- 1,615
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.