MT ELLIOT ST over I-94

IN DETROIT · County 163, Michigan · Built 2021 · 6 Lanes · 6,940 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

42.379183, -83.033736

This bridge is in worse condition than 10.3% of bridges in County 163. The average bridge in Michigan is 0 years old; this one is 5 years old.

Nearby Bridges

Bridge Details

Structure #
000000000011217
Year Built
2021
Length
78.4 m (257.2 ft)
Max Span
32.6 m
Width
27.1 m (88.9 ft)
Lanes
6
Daily Traffic
6,940
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.