IRR BIA RTE 3 over MISSION CREEK
SAULT STE MARIE AT CASINO · County 033, Michigan · Built 1996 · 2 Lanes · 500 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.4763, -84.324553
This bridge is in worse condition than 59.8% of bridges in County 033. The average bridge in Michigan is 0 years old; this one is 30 years old.
Nearby Bridges
IRR BIA RTE 1 over 08/23
Built 2002
IRR BIA RTE 1 over DRAINAGE TO SHUNK CREEK
Built 2002
IRR BIA RTE 1 over DRAINAGE TO SHUNK CREEK
Built 2002
IRR BIA RTE 2 over DRAINAGE TO SHUNK CREEK
Built 2002
RIVERSIDE DRIVE over MISSION CREEK
Built 2013
SPRUCE ST. over POWER CANAL
Built 1983
JOHNSTON ST. over POWER CANAL
Built 1979
I-75 BS (PORTAGE) over POWER CANAL
Built 1970
BINGHAM AVE. over POWER CANAL
Built 1976
1 1/2 MILE ROAD over ST MARYS RIVER
Built 2016
Bridge Details
- Structure #
- 00000000000F504
- Year Built
- 1996
- Length
- 15.8 m (51.8 ft)
- Max Span
- 14.6 m
- Width
- 10.1 m (33.1 ft)
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Bureau of Indian Affairs
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.