RIVERSIDE DRIVE over MISSION CREEK
SAULT STE MARIE · County 033, Michigan · Built 2013 · 2 Lanes · 5,071 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
46.477814, -84.304089
This bridge is in worse condition than 22.3% of bridges in County 033. The average bridge in Michigan is 0 years old; this one is 13 years old.
Nearby Bridges
IRR BIA RTE 1 over 08/23
Built 2002
IRR BIA RTE 1 over DRAINAGE TO SHUNK CREEK
Built 2002
IRR BIA RTE 2 over DRAINAGE TO SHUNK CREEK
Built 2002
1 1/2 MILE ROAD over ST MARYS RIVER
Built 2016
IRR BIA RTE 1 over DRAINAGE TO SHUNK CREEK
Built 2002
IRR BIA RTE 3 over MISSION CREEK
Built 1996
I-75 BS (PORTAGE) over POWER CANAL
Built 1970
SPRUCE ST. over POWER CANAL
Built 1983
JOHNSTON ST. over POWER CANAL
Built 1979
BINGHAM AVE. over POWER CANAL
Built 1976
Bridge Details
- Structure #
- 000000000001676
- Year Built
- 2013
- Length
- 18.3 m (60 ft)
- Max Span
- 17.6 m
- Width
- 13.2 m (43.3 ft)
- Lanes
- 2
- Daily Traffic
- 5,071
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.