FERGUS RD over FAIRCHILD CREEK
1.2 MI E OF BISHOP RD · County 145, Michigan · Built 2019 · 2 Lanes · 1,787 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
43.256025, -84.006572
This bridge is in worse condition than 16.5% of bridges in County 145. The average bridge in Michigan is 0 years old; this one is 7 years old.
Nearby Bridges
FERGUS ROAD over MISTEGUAY CREEK
Built 1947
BIRCH RUN ROAD over FAIRCHILD CREEK
Built 1974
BIRCH RUN ROAD over MISTEGUAY CREEK
Built 2004
BISHOP ROAD over MILLER DRAIN
Built 2012
BURT ROAD over MISTEGUAY CREEK
Built 1974
BURT ROAD over FAIRCHILD CREEK
Built 1972
BISHOP ROAD over FAIRCHILD CREEK
Built 1994
GARY ROAD over ALBERTS DRAIN
Built 1956
GARY ROAD over MITCHELL CREEK
Built 1995
FRY ROAD over MISTEGUAY CREEK
Built 2022
Bridge Details
- Structure #
- 000000000009211
- Year Built
- 2019
- Length
- 17 m (55.8 ft)
- Max Span
- 15.9 m
- Width
- 13.3 m (43.6 ft)
- Lanes
- 2
- Daily Traffic
- 1,787
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $225,000
- Total Project Cost
- $250,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.