GARY ROAD over ALBERTS DRAIN

0.7 MI E OF BISHOP ROAD · County 145, Michigan · Built 1956 · 2 Lanes · 783 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000009202
Year Built
1956
Length
10 m (32.8 ft)
Max Span
9.7 m
Width
8.9 m (29.2 ft)
Lanes
2
Daily Traffic
783
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$150,000
Total Project Cost
$170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.