M-26 over W BR FIRESTEEL RIVER

1.3 MI NE OF M-38 · County 131, Michigan · Built 2021 · 2 Lanes · 1,425 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000008504
Year Built
2021
Length
58.7 m (192.6 ft)
Max Span
57.7 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
1,425
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.