CROZER STREET over MIDDLE BR ONTONAGON RIV
VILLAGE OF WATERSMEET · County 053, Michigan · Built 1919 · 2 Lanes · 395 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
4
Poor
Substructure
3
Serious
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 4 | Poor |
| Substructure | 3 | Serious |
Location
46.774833, -89.177917
This bridge is in worse condition than 92.2% of bridges in County 053. The average bridge in Michigan is 0 years old; this one is 107 years old.
Nearby Bridges
M-38 over FLINTSTEEL RIVER
Built 1971
VICTORIA ROAD over ONTONAGON RIVER
Built 1977
US-45 over E BR OF ONTONAGON RIVER
Built 1958
FIRESTEEL ROAD over FLINTSTEEL RIVER
Built 1999
KANGAS ROAD over W BR FIRESTEEL RIVER
Built 2009
M-26 over W BR FIRESTEEL RIVER
Built 2021
WILDERNESS DRIVE over FIRESTEEL RIVER
Built 2009
BECK ROAD over FLINTSTEEL RIVER
Built 1987
M-26 over E BR FIRESTEEL RIVER
Built 2021
M-38 over W BR OF FIRESTEEL RIVER
Built 1958
Bridge Details
- Structure #
- 000000000003034
- Year Built
- 1919
- Length
- 10.6 m (34.8 ft)
- Max Span
- 10.3 m
- Width
- 6.9 m (22.6 ft)
- Lanes
- 2
- Daily Traffic
- 395
- Material
- Concrete
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $178,000
- Total Project Cost
- $245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.