AVON ROAD over CLINTON RIVER

BET JOHN R AND DEQUINDRE · County 125, Michigan · Built 2022 · 2 Lanes · 18,054 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000008182
Year Built
2022
Length
21.6 m (70.9 ft)
Max Span
20.7 m
Width
28.1 m (92.2 ft)
Lanes
2
Daily Traffic
18,054
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$232,000
Total Project Cost
$292,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.