M-150 over GTW RR CLIN R 1ST&2ST

IN ROCHESTER (S MAIN ST) · County 125, Michigan · Built 1989 · 4 Lanes · 25,367 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000007989
Year Built
1989
Length
246.9 m (810 ft)
Max Span
30.9 m
Width
21.4 m (70.2 ft)
Lanes
4
Daily Traffic
25,367
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.