BAA ROAD over CHOCOLAY RIVER

IN HARVEY VILLAGE · County 103, Michigan · Built 2020 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

46.495997, -87.350267

This bridge is in worse condition than 17.7% of bridges in County 103. The average bridge in Michigan is 0 years old; this one is 6 years old.

Nearby Bridges

Bridge Details

Structure #
000000000006569
Year Built
2020
Length
30.5 m (100.1 ft)
Max Span
30.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.