M-28 over CHOCOLAY RIVER

1.1 MI E OF US-41 · County 103, Michigan · Built 2005 · 2 Lanes · 9,335 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000006519
Year Built
2005
Length
40.8 m (133.9 ft)
Max Span
16.2 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
9,335
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$51,000
Total Project Cost
$60,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.