US-23 SB over HURON RIVER

2.2 MI N OF M-36 · County 093, Michigan · Built 1960 · 3 Lanes · 33,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000005731
Year Built
1960
Reconstructed
2011
Length
27.7 m (90.9 ft)
Max Span
13.1 m
Width
18.7 m (61.4 ft)
Lanes
3
Daily Traffic
33,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.