STEIN ROAD over SHEBEON DRAIN

SEC 30-31 WINSOR TWP · County 063, Michigan · Built 1915 · 2 Lanes · 240 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000003554
Year Built
1915
Reconstructed
1974
Length
15.8 m (51.8 ft)
Max Span
12.2 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
240
Material
Prestressed Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.