M-25 over SHEBEON DRAIN

2.5 MI S OF M-142 · County 063, Michigan · Built 1949 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000003445
Year Built
1949
Length
16.7 m (54.8 ft)
Max Span
16.7 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
2,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$26,000
Total Project Cost
$31,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.