BUCK HIGHWAY over SPRING BROOK DRAIN

4 MI S OF EATON RAPIDS · County 045, Michigan · Built 1995 · 2 Lanes · 73 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000002398
Year Built
1995
Length
18.6 m (61 ft)
Max Span
18.2 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
73
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.