BELLEVUE HWY over SPRING BROOK

3.5 MI S OF EATON RAPIDS · County 045, Michigan · Built 1910 · 2 Lanes · 1,130 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000002336
Year Built
1910
Length
9.4 m (30.8 ft)
Max Span
9.1 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
1,130
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$275,000
Total Project Cost
$475,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.