MOSTETLER ROAD over MOSTETLER CREEK

SEC 25 HAYES TWP · County 035, Michigan · Built 2022 · 2 Lanes · 250 vehicles/day

Overall
Good
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000001763
Year Built
2022
Length
10.7 m (35.1 ft)
Max Span
9.8 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
250
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$167,000
Total Project Cost
$297,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.