US-127 SB over US-127 BR & M-61

@ US-127 BR & M-61 · County 035, Michigan · Built 1961 · 3 Lanes · 6,558 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000001719
Year Built
1961
Reconstructed
2007
Length
47.8 m (156.8 ft)
Max Span
15.9 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
6,558
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.