I 495 NB over RR PCRR (ABANDONED)

.2 MI W OF ST 1A · County 021, Massachusetts · Built 1966 · 3 Lanes · 58,643 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
W460093T0DOTNBI
Year Built
1966
Length
28 m (91.9 ft)
Max Span
9.4 m
Width
16.6 m (54.5 ft)
Lanes
3
Daily Traffic
58,643
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,126,000
Total Project Cost
$4,690,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.