ST121 WEST ST over I 495

.7 MI NW OF ST 1A · County 021, Massachusetts · Built 1966 · 2 Lanes · 10,733 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W460083VLDOTNBI
Year Built
1966
Length
75.3 m (247 ft)
Max Span
37.2 m
Width
16.5 m (54.1 ft)
Lanes
2
Daily Traffic
10,733
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$8,141,000
Total Project Cost
$12,212,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.